Information Updates
2012
May
- May 9: Labour dispute at Candu Energy
- May 5: Wanted: your opinion on changes to regulatory framework for environmental protection
April
March
- March 28: Successfully Reclaiming Old Mining Sites in Northern Ontario
- March 27: Expansion of agreement for the repatriation of highly enriched uranium to the United States
- March 26: Moving Forward with Stronger Radiation Protection Programs
- March 22: CNSC allows Point Lepreau fuel reload
- March 20: Spotlight on Ontario public alerting systems
- March 20: Bruce A Unit 2 restart activities resuming: minor moderator system repair complete
- March 18: Bruce A Unit 2 returned to guaranteed shutdown state
- March 16: Decision by Federal Court of Appeal on McClean Lake Duty to Consult appeal
- March 16: CNSC Allows Bruce A Unit 2 Restart
- March 9: Stricter limits, smaller footprint, greater protection
- March 8: UK steam generator processing: an excellent example of responsible and safe nuclear waste management practices
February
- February 28: Could your collectible be radioactive?
- February 24: Cyber security at nuclear power plants
- February 23: New sources of medical isotopes
- February 16: Fraudulent cheques being falsely issued under the name of the Canadian Nuclear Safety Commission
January
- January 24: Nuclear power plants and solar flares
- January 23: Discharge of water containing hydrazine at Bruce A
- January 13: Steam generator processing: an excellent example of responsible and safe nuclear waste management practices
2011
December
- December 16: Information Update - Point Lepreau Generation Station
- December 14: Discharge of water containing hydrazine at Point Lepreau
- December 14: Small spill of heavy water at Point Lepreau
November
- November 22: Bruce A Unit 1 Fuel Reload
October
September
- September 18: CNSC issues a statement on the earthquake near Buckingham, Quebec
- September 12: Accident at French nuclear waste treatment facility
- September 6: Tornado in Trois-Rivieres did not impact Gentilly-2
August
- August 29: Point Lepreau not impacted by tropical storm Irene
- August 27: CNSC Monitoring Path of Hurricane Irene
- August 24: Report of Radiation Exposure at McMaster University Reactor Resulting from Skin Puncture by an exposed wire (PDF - source: McMaster Unviversity)
- August 23: Virginia Earthquake felt in Eastern Canada
- August 10: CNSC signs Protocol with New Brunswick Power for Point Lepreau Return to Service
June
- June 29: CNSC allows Bruce A Unit 2 fuel reload
- June 17: G2 Tritiated Water Leak; No Threat to Public or the Environment
April
- April 19: Update to regulatory action issued to Class I facilities and uranium mines and mills in Canada
- April 12: Update to regulatory action issued to all major nuclear facilities in Canada
March
- March 31:
- March 29: Radiological Monitoring at Canadian Nuclear Power Plants
- March 28: What are safe concentrations of radionuclides in air and water?
- March 23: Japan Earthquake: Radiation Dose Rates in Canada
- March 22: CNSC request to all Class I nuclear facilities and uranium mines and mills in Canada pursuant to subsection 12(2) of the General Nuclear Safety and Control Regulations
- March 19: Seismic Activity Near Major Canadian Nuclear Facilities
- March 18:
- March 17: CNSC Request to all major nuclear facilities in Canada pursuant to Subsection 12(2) of the General Nuclear Safety and Control Regulations
- March 16:
- March 15:
- March 14: Steam Generators: Reduce, Reuse and Recycle - The Three Rs of Radioactive Waste
- March 11: CNSC information update regarding the earthquake in Japan
- March 4: Moderator Water Spill at Pickering Unit 4 has no impact on the environment or public
February
January
- January 28: CNSC participates in IAEA Mission to Romania
- January 14: Update on Uranium Shipment
2010
November
- November 19: CNSC Submission Wins Award at IAEA International Symposium
- November 10: Recall of Nordion Inc. Teleflex cables
October
- October 8: CNSC submits fifth Canadian National Report for the Convention on Nuclear Safety to the IAEA
September
- September 22: Shutdown of Unit 6 at the Bruce B nuclear power plant
August
July
- July 30: Mahmoud Yadegari sentenced in Ontario Court of Justice for offences under the NSCA
- July 29, 2010 | July 26, 2010 | July 14, 2010: Bruce Power's proposed plan to ship 16 steam generators to Sweden
- July 15: CNSC requests additional information from Cameco about its Port Hope Conversion Facility emissions
- July 12: Potential Alpha Exposure of Workers: CNSC Request to all CANDU licensees - AECL and OPG Responses
- July 9: Potential Alpha Exposure of Workers: CNSC Request to all CANDU licensees
June
- June 4: Heavy Water Spill at Gentilly-2
April
March
- March 11: Bruce A Unit 1 Alpha Contamination
February
- February 25: CNSC monitoring recent events at Chalk River Laboratories
- February 19: Bruce A Unit 1 Alpha Contamination
January
- January 21: Bruce A Unit 1 Alpha Contamination